Up to date information regarding the restoration of steam locomotive 6029 in Canberra, ACT Australia. Beyer Garratt 6029 is an EX NSWGR locomotive and was a member of the largest, and most powerful class in Australia. The restoration to full working order is being undertaken by volunteers in Canberra.
6029 is owned by the Australian Railway Historical Society, ACT Division and the restoration is proudly supported by their tourist operations and by the generous donations of members and public supporters.
The society operates rail tours out of Canberra with our heritage fleet of steam and diesel locomotives and rolling stock every few weeks.
To travel in style on any of our tours, or to learn more about our collection and operations, go to Canberrarailwaymuseum.org
May 18, 2009
Sunday 17 May
Alan Gardner
Gavin Woolf
Alan Kent
Marc Millar
Stuart Edwards
Ian Senini
Alf Spiteri
David Villiers
Kyle Rollinson
Vince Patrech
John Kempton
Peter Anderson
Peter Reynell
and Howard Moffat
I will leave it to Al to list the days achievements...this post is to recognise those who were there yesterday.
a big weekend
You ask why?
Even in Canberra's relatively dry climate, the enemy of all things steel appears. In this case, the worst parts are the window cut outs where the gutters naturally collected, but not necessarily diverted rain, and areas near the doors where two or three layers of plate are now interspersed with oxidised steel.
Best to fix it "proper" now; roof off will give better access.
And the roof itself is a maze of holes where everything that could be hung, was. Even the ceiling was held up [or down] by a bolt through the roof.Actually, many bolts.
Then, more holes for the colonial conversion to dual control. Another heavy casting, more holes in the roof.
May 4, 2009
Saturday 2nd of May 2009
Many of the boiler cladding sheets for the back head are in poor condition and Gavin’s new plasma cutter was put to good use for the first time. Marc and Ted experienced the joys of sheet metal work and a result the back head sheets are now about 90% complete.
Back in Sydney Mike Reynell is organising the manufacture of 50+ element washers and when completed we can start installing the new elements. As usual Bruce s continuing with the machining of the many replacement components.
Our next workday is Sunday the 17th of May starting at about 9 am, all welcome!
Alan Gardner
Apr 25, 2009
hi ho; hi ho..its off to work we go...
Apr 24, 2009
Sunday 20 April 2009
Even before the weekend Bruce has been busy manufacturing many of the small components required to keep up with the re assembly work. Because of Bruce’s efforts the centrifugal steam separator in the dome was final fitted by Gavin, although it was a tight squeeze. With only some minor work required Gavin will re fit the steam dome and complete the final out of the boiler.
The boiler cradle clean up and assessment continued at a rapid rate. Marc continued with the steam cleaner and Howard was assisted by Stuart on the needle gun. Alan completed the work on the main steam lines under the cab. David and Stuart helped out with the cladding sheets for the back head as they will have to be fitted before the boiler is lowered into the cradle.
Two new volunteers Kyle Rowlingson and John Kempton started on the day and as a result the hind engine unit some sports some gloss black paint. During the afternoon the superheater header was trial fitted and all being well the next workday should see it fitted into place.
If we can keep up the good attendance we anticipate completing the boiler cradle work in the next couple of months. In parallel work is continuing on the change over boiler and this work should be completed about the same time line as the cradle.
Thanks to the efforts of Carl on the super heater header two weeks ago we will put off lowering the boiler on to the cradle and inturn the elements will be fitted while the boiler is on the ground. To this end we are proposing to hold a super week in July to facilitate the fitting of the elements and smoke box. So If you have some annual leave up your sleave and would like to enjoy a full week straight of steam fitting you are most welcome. Accommodation is available in our luxurious BAM sleeper carriages thanks to Matt and Trev.
As the preparation work on the boiler and cradle is coming to a end we will start to look at the removal of the four bogies from off the engine units. Preliminary inspection has revealed some very sick lateral control springs and some of the horn liners will need replacing also. As soon as we can get our crane driver Michael Potter away from his ever expanding family we will lift the engine units clear of the bogies. Our old mates from Eveleigh have offered to come down when the warmer weather returns in September and we are hope that they can help out with the bogie rebuilds.
Alan Gardner
As you can see, pictures this month show that the visible progress is now starting to accelerate, and you will see that the grey undercoat, that was becoming quite dominant in last months pictures, is now starting to disappear under top coats of black and red paint. Great stuff!
Apr 20, 2009
What happened away from Steamfest 18/19 April
On the big day in Canberra ten or so turned up to work on the big engine which saw the superheater header offered back to the smokebox, the main steam pipe reinstalled [thanks, Bruce for making the special bolt, and Mike for finally remembering where he hid the strap and Gav for hiding in the boiler whilst doing the work!] and more painting, painting and painting. Three new faces too, and of course the second best BBQ!
All this with our little mate, 3016 steaming out to Bungendore, again..and having a bit of a slip on the way back..look at Andy's blog for info on that .
There is a feeling now of [mild] confidence as we are more putting it back together than pulling it apart. Help us by donating or coming along and doing a bit.
Work days in Canberra are FIRST SATURDAY and THIRD SUNDAY...but see Alans [forthcoming] comments about the JULY superweek.
Apr 6, 2009
Saturday 4 April workday
A great day...perfect weather yes, it does sometimes happen in Canberra! Come along on the 19th to experience it.
Al and Gav played tinplaters ..they made good progress in cutting, shaping and fitting cladding [for out - of staters "cleading"] around the "new" boiler firebox area, looks sooooo good without rust holes!
Peter R wondered aloud if he could still spray paint and found that the lessons learned first time around could still be remembered, Al's comment was "looks like you have a job, again!
Howard M, Mike Ridley Roger and Stewart [sorry, do not know if I got this right] worked away at the boiler frame..rust removal...undercoat and even some black enamel. It looks great chaps!
On a broader aspect other things were happening too on Saturday:
the 1 2 1 0 was being steamed and beautifully polished by Brigadeer Brasso amd David Carroll along with a new recruit; the purpose being to provide a backdrop for some wedding fotos.
[ a picta, please, Mr VP MacAndo?]
the 3016 was having a paint tone-up by Dave Malcolm and Andy, looks good, guys!
Our Heritage diesel 4807 was off at the Highland Games with a full load of happy customers, Brigadoon looked to being well celebrated when Mike Ridley and I took a happy snap on the way home.
Mar 29, 2009
Worth a read...The Down Home with Andy!
Mar 26, 2009
eating humble pie...
The pix are 6029 and K153 running side by side on the way to Wangaratta in June 1980.
two uncaptioned shots during the Great Circle tour in June 1981.
As soon a webmasterMike can, he will make the corrections.
Meantime, sorry Dennis
Mar 18, 2009
Sunday 15 March
Our next workday will be held on the Saturday the 4th of April 2009. The main focus of work will be the boiler cradle.
Alan Gardner